PROPOSAL TO CO LOCATE ON AN EXISTING MOBILE PHONE BASE STATION AT 18 MAIS STREET, BROMPTON SA 5007 INCLUDING 5G
- The proposed facility consist of the addition of new Vodafone 5G equipment and associated works as follows:
- Installation of Three (3) Vodafone passive antennas not more than 2.8m in length onto proposed new headframe.
- Installation of Three (3) Vodafone 5G antennas not more than 1.2m in length onto the proposed new headframe.
- Installation of Twelve (12) Remote Radio Units (RRU's) installed on new steel mounts behind the antennas.
- Installation of ancillary equipment, cabling, GPS antennas and other items associated with the safety and operation of the facility; and
- Installation of a One (1) Outdoor equipment cabinet adjacent to the pole.
- Vodafone regard the proposed installation as low impact under The Telecommunications (Low-impact Facilities) Determination 2018 based on the description above.
- In accordance with Section 7 of C564:2020 Mobile Phone Base Station Deployment Code, we invite you to provide feedback about the proposal. Should you require further information or wish to comment, please contact: Abhishek Gampala from Nokia Solutions & Networks on
0413 809...
or at communityrelations.vha@groups.nokia.com until 5pm Friday 14 February 2025. Further information may also be obtained from https://www.rfnsa.com.au/5007005