Search Buy Search Sell

×

PROPOSED DEVELOPMENT

3/11/2023

Proposed Development

Make a submission from

06 November 2023 to 24 November 2023

Development Permit for combined application for – Material Change of Use – Renewable Energy Facility and Battery Storage Facility (8MW electrical generation solar station and battery storage facility) and Utility Installation (hydrogen production, hydrogen power generation conversion and Utility Installation to distribute generated power) and Operational Work- excavation and filling over 25m3 and Operational Work- work within an unconstructed local government road between Lease Area B and Lease Area C (installation of underground cables and construction of road access driveway and drainage) and Reconfiguration of a lot- creating two lots by lease agreement for a period of more than ten (10) years).

Where: 174 Buchanan Creek Road Cow Bay 4873

On: Part Lot 5 on BK157130 and part unformed gazetted road adjacent to parts of lot 5 on BK157130

Approval sought: Development Permit for combined application for – Material Change of Use, Operational Work and Reconfiguration of a Lot (by lease agreement)

Application ref: CA2023_5496/1

You may obtain a copy of the application and make a submission to:

Douglas Shire Council

PO Box 723, Mossman QLD 4873

enquiries@douglas.qld.gov.au

07 4099 ...

https://www.douglas.qld.gov.au

Public notification requirements are in accordance with the Planning Act 2016

Townsville 4810